Monday, June 28, 2010

Week 18 Wrap Up

We have started using the basement!!!

The contractor, carpenter and electrician were at the house on Friday to install the tv, the movie screen and finish up some odd jobs....They wrapped up around 2pm.  Once gone, I pulled up the paper from the floor and vacuumed it clean!

The floors look better than ever under the white white, crispy, low voltage track lights (definitely more grey than black).  And yes, they do show every spec of dust.

After cleaning up, my DH and I assembled the IKEA kivik sofa.  Here's the thing: its scratchy and makes me itch...I am super sensitive like that.  My DH thinks the sofa just needs to be broken in...I think it needs a gorgeous cashmere throw that I can bundle myself into. (I feel itchy just thinking about it)

Nothing happened today. Tomorrow is our final inspection, and the stainless & bathroom tiles will be delivered to the house. 
 

4 comments:

  1. You're right, the floors look amazing! Can't wait to see the final product!

    ReplyDelete
  2. Looks great, especially the floors - lots of room for the little one to play in! I like the track lighting. We're considering using it too in our basement so its great to see how it looks in your space (which actually has a very similar layout to our basement).

    ReplyDelete
  3. I am seriously loving those floors! I can only imagine how excited you must be. Our basement has actually started to really progress and excites me that it will soon be a useable space... for the first time (since we never used it before)

    ReplyDelete
  4. You're right, the floors look amazing! Can't wait to see the final product!

    ReplyDelete